Yes. A building and electrical permit is required. Call your local zoning department to inquire if a zoning permit is required.
No, not on all work but this depends on the complexity of work being done.
For pole mounted solar panels or wind turbines a footer inspection is done. An electrical trench and service release may be required along with a final
building and electric. This depends on the type and how extensive the work being performed is.
Yes. Please call between the hours of 7am to 8am the day of the inspection.